| |
1230 Carrick Street
Thunder Bay, ON
P7B 5P9
Phone: (807) 623-3500
Fax: (807) 622-9638
mlaltd@tbaytel.net
|
|
|
|
Crane Photo Gallery
|
Photo Gallery Index |
Girder Erection from marine barges for 110th Avenue Bridge Construction in Thunder Bay
Bridge demolition for MTO structure at Gullwing River
Sheet pile driving or cofferdam construction
Staged bridge demolition at Little Savanne River near Upsala for MTO, in preparation for construction of new bridge
Back to Top
Structural Steel erection at Little Savanne River Bridge near Upsala, for MTO
Box Culvert Construction at McKellar Creek for Ministry of Transportation
Demolition of Jacknife Bridge approaches in Thunder Bay
Demolition of Jacknife Bridge approaches in Thunder Bay
Back to Top
Sediment pond dredging with clamshell crane at Williams Mine
Wheolite HDPE wetwell installation during French Drain construction
Sediment pond dredging with clamshell crane at Williams Mine
18' diameter CSP vent pipe installation at Goldcorp's Shaft #3 Expansion
Back to Top
Hoisting CSP Vent Plenum at Goldcorp Red Lake Mine Shaft #3 Expansion
Construction of Collar Walls and CSP Service Tunnels at Goldcorp Shaft #3 Expansion
Headframe steel erection at Goldcorp Red Lake Mine Shaft #3 Expansion
Steel Erection & Concrete Forming at Goldcorp Shaft #3 Expansion
Back to Top
Steel Erection & Concrete Forming at Goldcorp Shaft #3 Expansion
Installation of Production Hoist Drum at new Mining Surface Plant
Marine pipeline cover material placement by barge mounted clamshell crane for TCPL on Nipigon River
Back to Top
|
|
|