| |
1230 Carrick Street
Thunder Bay, ON
P7B 5P9
Phone: (807) 623-3500
Fax: (807) 622-9638
mlaltd@tbaytel.net
|
|
|
|
Earthmoving Photo Gallery
|
Photo Gallery Index |
Excavation for deep till-core dam foundation at Williams Mine
Bentofix bentonite liner installation for deep till-core dam foundation at Williams Mine
Glacial till placement for tailings dam raise at Inco's Shebandowan Mine
Dewatering for deep foundation dam at Williams Mine
Back to Top
Rock excavation at Noranda's Geco Mine with 60 ton Euclid
Mass clay excavation for WTP holding pond at Noranda's Geco Mine
Mass clay excavation for WTP holding pond at Noranda's Geco Mine
Quarrying operation including drill/blast
Back to Top
Overburden excavation concurent with material placement for earthen dam construction
Tailings Dam raise earthmoving at Williams Mine
Tailings Dam raise earthmoving at Williams Mine
Overburden removal for open pit expansion at Williams Mine
Back to Top
Till pit development with Caterpillar 365 excavator
Winter rock excavation at Noranda's Geco Mine
Holding Pond excavation at Noranda's Geco Mine
Holding Pond excavation at Noranda's Geco Mine
Back to Top
Aggregate Screening Operation
Rock and earth excavation for Goldcorp Shaft #3 Site Preparation
Overburden excavation for dam foundations at Noranda's Mattabi Mine
Tailings dam frost protection stripping at Williams Mine
Back to Top
Tailings dam frost protection stripping at Williams Mine
Till-core and filter zone placement for tailings dam construction
Till-core and filter zone placement for tailings dam construction
Excavation for Box Culvert Foundations at Ripple Creek for Ministry of Transportation
Back to Top
Excavation for Box Culvert Foundations at Ripple Creek for Ministry of Transportation
Rock Blasting at McKellar Creek for Highway Widening
Back to Top
|
|
|