1230 Carrick Street
Thunder Bay, ON
P7B 5P9
Phone: (807) 623-3500
Fax: (807) 622-9638
mlaltd@tbaytel.net
|
|
|
|
Environmental Photo Gallery
|
Photo Gallery Index |
Sediment pond dredging with clamshell crane at Williams Mine
Slope stabilization for TCPL environmental rehabilitation project at Cache Creek (Nipigon)
Slope stabilization for TCPL environmental rehabilitation project at Cache Creek (Nipigon)
Access road construction for seepage control dam at Noranda's Geco Mine
Back to Top
Rockfill toe-stabilization berm construction for existing dam at Noranda's Geco Mine
Manufacturer training on Leica Systen 1200 GPS survey system
Clay excavation and rockfill operation for seepage collection facility
Sediment pond dredging with clamshell crane at Williams Mine
Back to Top
Wastewater holding pond construction at Noranda's Geco Mine
Wastewater holding pond construction and excavation at Noranda's Geco Mine
Wheolite HDPE wetwell installation during French Drain construction
Back to Top
Overburden excavation for dam foundations at Noranda's Mattabi Mine
Tailings Dam raise earthmoving at Williams Mine
Back to Top
|
|
|