MLA Northern Contracting Ltd. Northwestern Ontario's Heavy Civil General Contractors & Crane/Equipment Rentals
EarthmovingBridges and InfrastructureIndustrialDemolitionEnvironmental
MLA Northern Contracting Ltd. Northwestern Ontario's Heavy Civil General Contractors & Crane/Equipment Rentals 1230 Carrick Street
Thunder Bay, ON
P7B 5P9
Phone: (807) 623-3500
Fax: (807) 622-9638
mlaltd@tbaytel.net



Environmental Photo Gallery


Photo Gallery Index
Sediment pond dredging with clamshell crane at Williams Mine
Sediment pond dredging with clamshell crane at Williams Mine

Slope stabilization for TCPL environmental rehabilitation project at Cache Creek (Nipigon)
Slope stabilization for TCPL environmental rehabilitation project at Cache Creek (Nipigon)

Slope stabilization for TCPL environmental rehabilitation project at Cache Creek (Nipigon)
Slope stabilization for TCPL environmental rehabilitation project at Cache Creek (Nipigon)

Access road construction for seepage control dam at Noranda's Geco Mine
Access road construction for seepage control dam at Noranda's Geco Mine
Back to Top

Rockfill toe-stabilization berm construction for existing dam at Noranda's Geco Mine
Rockfill toe-stabilization berm construction for existing dam at Noranda's Geco Mine

Manufacturer training on Leica Systen 1200 GPS survey system
Manufacturer training on Leica Systen 1200 GPS survey system

Clay excavation and rockfill operation for seepage collection facility
Clay excavation and rockfill operation for seepage collection facility

Sediment pond dredging with clamshell crane at Williams Mine
Sediment pond dredging with clamshell crane at Williams Mine
Back to Top

Wastewater holding pond construction at Noranda's Geco Mine
Wastewater holding pond construction at Noranda's Geco Mine

Wastewater holding pond construction and excavation at Noranda's Geco Mine
Wastewater holding pond construction and excavation at Noranda's Geco Mine

Wheolite HDPE wetwell installation during French Drain construction
Wheolite HDPE wetwell installation during French Drain construction
Back to Top

Overburden excavation for dam foundations at Noranda's Mattabi Mine
Overburden excavation for dam foundations at Noranda's Mattabi Mine

Tailings Dam raise earthmoving at Williams Mine
Tailings Dam raise earthmoving at Williams Mine
Back to Top

Crane RentalsContactPhoto Gallery
Copyright © 2006 MLA Northern Contracting Ltd. All Rights Reserved         Website Design by CS Design Studio